Lithologic
contact |
Depth
(mbsf) |
Predicted
two-way traveltime (s) |
---|---|---|
Unit 1/2 | 864.8 | 6.982 |
Unit 2/3 | 929.2 | 7.03 |
Unit 3/4 | 1029.5 | 7.108 |
Unit 4/Subunit 5A | 1069.4 | 7.147 |
Subunit 5A/5B | 1129.8 | 7.201 |
Subunit 5B/5C | 1502.1 | 7.516 |
Top of first sill | 1612.8 | 7.598 |
Top of second sill | 1719.4 | 7.681 |
Note: Based on laboratory measurements of sediment velocities below the lithologic Unit 1/2 contact. The Unit 1/2 contact is interpreted to correlate with the strong reflection in SCREECH line 2MCS data at 6.98 s.